Stone guard rubber PV LH
Part no: 87781
14-30 days
$ 29.89
- Information
-
Information
To simplify installation, start out by lubricating the plugs with vegetable based grease (do not use mineral oils).Then apply a little bit of hand / thumb pressure from the outside, while carefully pulling the plugs from the inside with nippers. The gravel deflector will easily slide in place. Unit: pc(s) Delivery: - Related parts
- Possible alternatives
- Set contains